EMPLOYER: RAILWAY PROJECT MANAGEMENT UNITREGION II
1. Work scope:
- Repair in-use railway which was damaged by disaster.
2. Main work amount:
- Item 14: Km1148+250- to Km1148+550: excavate soil bed, excavate foundation soil grade 3; fill soil K95, crushed stone; carry out railway stone shoulder, add ballast…
- Item 26: section Km1212+690 to Km1213+350: excavate shoulder, slope; excavate foundation; fill foundation hole, carry out slope; carry out cutoff dike, channel; carry out railway stone shoulder, add ballast…
- Item 27: section Km1213+350-Km1217+300: construct railway bridge
- Item 32: section Km1229+900 to Km1230+800: carry out steel grid, excavate soil, stone;drainage hole, dike, carry out culvert; reinforced bar concrete retain wall…
3. Total contract value: 78.561.100.000 dongs
(Seventy eight billions, five hundreds sixty one millions,one hundred thousands dongs)
4. Construction time:
- Start: 2010
- Complete: 2010