EMPLOYER: RAILWAY PROJECT MANAGEMENT UNIT (RPMU)
1. Work scope:
- Carry out 62 culverts, in which construct 50 new culverts in the upgrade section and 12 culverts in the realignment section.
- Upgrade 81km (km144+750 to km169+900 and km173+900 to km230+000)
- Realignment 4km (km169+900 to km173+900)
- Cải tạoUpgrade, install new track, extend track, upgrade superstructure of station: 10 stations
- Upgrade 09 level crossings
- Upgrade 47 bridges, in wich 01 new bridge in the realignment section, upgradde 46 weak bridges
- Carry out 35 slope protection(in which 24 sections in the upgrade section and 11 sections in the realignment)
- Carry out track bed mud, stone: 09 sections
- Handle weaks soil at station: 03 stations
- At Văn Phú station: construct new Văn Phú stations, homestay, locomotive offfice, locomotive repair office, power office, locomotive, turnout guard.
Carry out longtitudinal drainage channel: shape channel R40 to R85: 3425m
2. Main work amount:
- Excavate track bed: 149.091 m3
- Remove sleeper (Sleeper K1, K3A, Steel sleeper, Wood sleeper, PC Sleeper): 116.338 units
- Remove rail(P43, short rail, guard rail): 12.094 units
- Carry out track bed stone: 85.250 mđ
- Install sleeper (PC sleeper): 128.719 units
- Install rail P50 L=25m: 5.446 units
- Add stone: 106.979 m3
3. Total contract value: 332.640.000.000
(Three hundreds thirty two billions, six hundreds forty millions dongs)
4. Construction time:
- Start: 2012
- Complete: 2015