Upgrading Ha Noi - Ho Chi Minh city Railways

Package 17: Upgrade section  Km909+516- Km919+152; Km949+383- Km958+270; Km991+604- Km1003+900 and make shop drawing project

EMPLOYER:      
RAILWAY PROJECT MANAGEMENT UNIT REGION 2

1. Work scope:

- Install new rack

2. Main work amount:

Track bed

a. Realignment

Excavate track bed                             3.390,24 m3
Fill track bed                                        5.153,34 m3
Excavate stone                                    764,35 m3

b. Non-realignment

Excavate track bed                             8.859,51 m3
Mark layer                                            2.045,1 m3
Fill track bed                                       5.758,35 m3

Carry out cutoff dike                           1.948,86 m3
Excavate foundation                           3.279,59 m3
Fill soil after construction                  1.637,47 m3

Superstructure

Remove old concrete sleeper         31.036 units
Old steel sleeper                                5.477 units
Old wood sleeper                               914 units
Remove rail P43 L=12,5                    4.202 units
rail 25                                                     231 units
Carry out track bed stone                   18.840,19 m
Add ballast into old track                     27.726,62 m3
Install sleeper DWL+accessories    40.724 units
Install wood sleeper

 Install steel sleeper                             2.582 units

Install new track:                                                      0.9 km
                                                           
3. Total contract value:  190.354.344.000 dongs
(One hundred ninety billions, three hundreds fifty four millions three  hundreds forty four thousands dongs)

4. Construction time:
- Start:                                        2010
- Complete:                              2012