New 2 bridges- Tam Bac Bridge and Thi Cau Bridge under project: Construction new 3 bridges following urgent order: Dong Nai, Tam Bac, Thi Cau.

1. Scope of work:

                        - On track operating.

                        - Permanent PC bridge;

                        - Design load: HL93;

                        - Parameter: Width 12m (including parapet); length: 197.85m, span structure using reinforced concrete girder I with L33m; H=1.65.

2. Main work:

                        - Cast, Drive pile 35x35cm; auger cast pile

                                               

3. Contract value:                     52.706.000.000 vndong

(In word: fifty two billion, seven thousand and six million vietnam dong only)

4. Construction time

- Commencement:                     2/2012

- Complete                                4/2013