1. Scope of work:
- New construction.
- Cross section of main girder with the shape I
2. Main work:
- PC abutment on auger cast pile with diameter D=1.0m. track work at approaches of bridges with width of B-=7.0, then runoff to B foundation=5m, B=3.5m. Pavement structure include: standard asphalt 3kg/m2, thickness 2.5cm. Insert buffer macadam thickness of 14cm, Standard buffer for below layer with 14cm thickness, compaction soil K95.
.
3. Total value: 19.566.903.000 vndong
(ninety billion, five hundred and sixty six million, nine hundred and three thousand vndong only)
4. Construction time
- Commencement: 2014
- Complete 2015