1. Scope of work:
- Upgrading highway
2. Main work:
- Excavate: 4.739m3
- Excavate improper soil: 15.237m3
- Excavate old pavement: 2.038m3
- Filling soil K95: 45.292m3
- Filling soil K98: 3.657m3
- Filling sand K90: 4.512m3
- Geotextile fabric: 10.279m2
- Macadam aggregate type 1, type 2 14.360m3
- Coating impregnated bitumen: 44.058kg
- Macrograph grained asphalt concrete, fine grained 3.511m3
- Reinforced PC girder: 10 pieces
3. Contract value: 18.436.800.000 vndong
(In word: eighty billion, four hundred and thirty six million, eight hundred thousand vndong only)
4. Construction time:
- Commencement: 12/2007
- Complete: 3/2008