Railway construction and goods yard under project: Lao Cai station yard

1. Scope of work:

- Construct new railway

- Construct new goods yards system and roadway inside goods system;

- New drainage for goods yard

- Overhaul railway inside station

- Level crossing

- Repair roadway and goods yard.

2. Main work:

- New 04 siding track with total length                                                                 1.200m

- New goods yard and roadway inside goods yard                                              10.430m2

- Overhaul railway inside station:                                                                        450m

- Make track crossing 02 tracks with the width of                                                 8m

3. Total value:              9.135.727.000 vndong

(In word: nine billion, one hundred and thirty five million, seven hundred and twenty seven thousand vndong only)

4. Construction time:

- Commencement:                                                                                             11/2001

- Complete:                                                                                                       12/2002

Chua xac dinh thoi diem thong tau Ha Noi Lao Cai