Ben Chua Bridge at Km2+390, Project: Ho Chi Minh City- Trung Luong Highway (stage 1)  
Back Print Yahoo

1. Scope of work

- Permanent presstressed steel-enforced concrete

- Span structure: 3x15m;

- Width: B=21.6m

- Designed load: HL93, person 300kg/cm2

- Length: 52.2m

2. Main work:

- Reinforced concrete pile 40x40cm:                                                                   5.228m

- PC girder plate 15m                                                                                         66 pieces

- Reinforced concrete, abutment 35Mpa:                                                                        886m3

- Asphalt pavement 2 layers                                                                               1.756m2

- Steel pile for abutment, pier                                                                             3960m

3. Contract value:                                                                                 19.572.805.000 vndong

4. Construction time

- Commencement                                                                                              10/2005

- Complete:                                                                                                       12/2007

Last updated: 07/10/2014