EMPLOYER: RAILWAY PROJECT MANAGEMENT UNIT REGION I

1. Work scope carried out by Construction Joint Stock Company No 6:

- Construction at in-use railway

- Track gauge railway1435mm and 1000mm

- Replace rail P43 12,5m long

- Stone screening, undercutting; add stone, replace wood sleeper, with concrete sleeper

- Maintain turnout, level crossing

- Excavate track bed, construct dike, culvert, drain

2. Main work amount

- Length of maintained track:                  `                                               87.433m

- Replace rail P43:                                                                                 537 units

- Replace concrete sleeper:                                                                    105.700 units

- Maintain turnout:                                                                                  80 sets

- Add ballast:                                                                                         128.474 m3

- Construct retain wall, ashlar channel:                                                     6.942 m3

3. Total contract value: 256.078.198.500 dongs

(In word: two hundreds fifty six billions,  seventy eight millions,

one hundred ninety eight thousands, five hundreds đồng chẵn)

            4. Construction time:

- Start:                                                  01/2002

- Complete                                            06/2010


Last updated: 01/03/2013