EMPLOYER: DA BAC Storage Company- VINACOMIN
1. Work scope carried out by Construction Joint Stock Company No 6:
- Improve, upgrade railway.
- Excavate track bed, excavate channel, construct drainage channel.
- Replace rail, sleeper, turnout on railway
- Install new track 1000mm
2. Main work amount:
Track bed, drainage
Excavate soil grade 3 37.081 m3
Fill soil track bed K95 35.871 m3
Construct ashlar channel 1.908 m3
Superstructure
Remove rail P43 920 Units
Remove concrete sleeper 8.698 Units
Remove turnout 16 Units
Install prestressed concrete sleeperTN1 15.380 Units
Install new track 9.750 M
Add ballast 25.562 m3
3. Total Work Value: 98.190.248.000 dongs
(In word: Ninety eight billions, one hundred ninety millions, two hundreds forty eight thousands dongs)
4. Construction Time:
- Start: 8/2005
- Complete: 2010