Upgrading Yen Vien - Lao Cai Railways  
Back Print Yahoo

EMPLOYER:  RAILWAY PROJECT MANAGEMENT UNIT  (RPMU)

1. Work scope:

-                Carry out 62 culverts, in which construct 50 new culverts in the upgrade section and 12 culverts in the realignment section.

-               Upgrade 81km (km144+750 to km169+900 and km173+900 to km230+000)

-               Realignment 4km (km169+900 to km173+900)

-               Cải tạoUpgrade, install new track, extend track, upgrade superstructure of station: 10 stations

-              Upgrade 09 level crossings

-               Upgrade 47 bridges, in wich 01 new bridge in the realignment section, upgradde 46 weak bridges

-               Carry out 35 slope protection(in which 24 sections in the upgrade section and 11 sections in the realignment)

-               Carry out track bed mud, stone: 09 sections

-               Handle weaks soil at station: 03 stations

-               At Văn Phú station: construct new Văn Phú stations, homestay, locomotive offfice, locomotive repair office, power office, locomotive, turnout guard.

Carry out longtitudinal drainage channel: shape channel R40 to R85: 3425m

 

2. Main work amount:

- Excavate track bed:                                                                                                   149.091 m3

- Remove sleeper (Sleeper K1, K3A, Steel sleeper, Wood sleeper, PC Sleeper):                116.338  units                                                                                                      

- Remove rail(P43, short rail, guard rail):                                                                         12.094 units

- Carry out track bed stone:                                                                                           85.250 mđ

- Install sleeper (PC sleeper):                                                                                        128.719 units

- Install rail P50 L=25m:                                                                                                5.446 units

- Add stone:                                                                                                                106.979 m3
            3. Total contract value:   332.640.000.000
                                    (
Three hundreds thirty two billions, six hundreds forty millions dongs)
            4. Construction time:

- Start:                  2012
- Complete:            2015

Last updated: 01/18/2013
Viewed: 3204