Construct Tra Von bridge at Km127+125 project: South Hậu river construction  
Back Print Yahoo

EMPLOYER: MỸ THUẬN PROJECT MANAGEMENT UNIT

 

1. Work scope

- Permanent prestressed concrete bridge

- Span: 5x33m;

- Width: B= 7,5m

- Load weight: H30- XB80, 300kg/cm2

- Length: 175,1m

2. Main construction amount:

- Reinforced concrete pile 40x40cm:                                                                   3340m

- Prestressed concrete sleeper girder cover plate span 15m:                                15 units

- Reinforced concrete abutment, pier 35Mpa:                                                      481m3

- Fine grain asphalt conrete road surface:                                                           1.073m2

- Engineer fabric:                                                                                               2.641m2

- Sand pipe D40:                                                                                               37.110m

3. Total contract value:             20.500.000.000 dongs

4. Construction time

- Start:                                                                          8/2006

- Complete:                                                                   5/2008


Last updated: 01/03/2013