EMPLOYER: MỸ THUẬN PROJECT MANAGEMENT UNIT
1. Work scope
- Permanent prestressed concrete bridge
- Span: 5x33m;
- Width: B= 7,5m
- Load weight: H30- XB80, 300kg/cm2
- Length: 175,1m
2. Main construction amount:
- Reinforced concrete pile 40x40cm: 3340m
- Prestressed concrete sleeper girder cover plate span 15m: 15 units
- Reinforced concrete abutment, pier 35Mpa: 481m3
- Fine grain asphalt conrete road surface: 1.073m2
- Engineer fabric: 2.641m2
- Sand pipe D40: 37.110m
3. Total contract value: 20.500.000.000 dongs
4. Construction time
- Start: 8/2006
- Complete: 5/2008