1. Scope of work:
- Upgrading railway
2. Main work:
Subgrade | | |
Cutting soil class 3 | 30.794,58 | m3 |
Filling soil K95 | 8.271,12 | m3 |
Super structure | | |
Remove rail P43 | 252 | bar |
Remove concrete sleepers | 2.088 | bar |
Remove turnout | 8 | bar |
Install PC sleepers TN1 | 596 | bar |
Install new track with rail P43 R>400m | 742,25 | m |
Adding ballast | 3.888 | m3 |
Levelling and tamping | 3.282,05 | bar |
3. Contract value: 33.592.081.000 vndong
( Thirty three billion, five hundred and ninety two million, eighty one thousand vndong only)
4. Construction time:
- Commencement: 2011
- Complete: 2012