EMPLOYER: MY THUAN PROJECT MANAGEMENT UNIT
1. Work Scope:
- Expand, improve road
- Excavate track bed, excavate channel, construct drainage channel.
- Tra von, Tra von B bridge construction
2. Main Work Amount:
- Excavate soil: 69.781,58 m3
- Fill sand: 145.549,33 m3
- Over the geotextile: 206.787 m2
- Culvert: 163 m
- Drive sheeting pile: 228.644,65 m
- Construction of foundations, pavement asphalt concrete: 39.552,26 m2
- Construction of gravel road asphalted: 182.861,73 m2
3. Total Work Value: 137.873.196.000 dongs
(In word: One hundred thirty seven billions, eight hundreds seventy three millions
one hundred ninety six thousands dongs)
4. Construction time:
- Start: 01/2006
- Complete: 2009