EMPLOYER: PROJECT MANAGEMENT UNIT 5
1. Work Scope:
- Improve road
2. Main Work Amount:
- Excavate soil: 4.739m3
- Excavate unsuitable soil: 15.237m3
- Excavate old road surface: 2.038m3
- Fill soil K95: 45.292m3
- Fill soil K98: 3.657m3
- Fill sandK90: 4.512m3
- Engineer fabric: 10.279m2
- Aggregate type 1, type 2: 14.360m3
- Spray asphalt: 44.058kg
- Asphalt concrete coarse grain, fine grain: 3.511m3
- Prestressed reinforced bar beam: 10
3. Total Work Value: 18.436.800.000 dongs
(In word: Eighteen billions, four hundred thirty six millions, eight hundreds thousands dongs)
4. Construction Time:
- Start: 12/2007
- Complete: 3/2008