EMPLOYER: Railway Projects Management Unit
1. Work scope carried out by Construction Joint Stock Company No 6:
- Upgrade drainage system, install round culvert, box culvert.
- Upgrade Huế station track
2. Main work amount:
- Excavate: 11.265 m3
- Excavate bed soil: 10.017 m3
- Excavate soil: 3.189 m3
- Crushed stone 1x2: 2.328 m3
- Crushed stone 4x6: 2.365 m3
- Ashlar: 4.338 m3
- Pave ashlar: 9.211,21 m3
- Excavate old ballast: 2.804 m3
- Add new ballast: 3.606 m3
- Excavate soil: 2.113,5 m3
- Ashlar: 631,25 m3
- Install channel U reinforced concrete, L=1m: 1.237 sections
3. Total contract value: 40.070.000.000 dongs
(In word: Forty billions, seventy millions dongs)
4. Construction time:
- Start: 2009
- Complete: 2010