Construction: Section Km247+700- Km251+758.35, section Thach My- Cau Xoi, under project: Ho Chi Minh Highway  
Back Print Yahoo

1. Scope of work:

- Expand and renew road bed

- Hot asphalt concrete pavement

- Excavate, replace weak soil

- Cutting soil, mining road bed

2. Main work:

- Cutting soil:                                                                                        87.856m3

- Filling soil:                                                                                          74.499m3

- Replace weak soil:                                                                               3.710m3

- Macadam aggregate:                                                                           390.465m3

- Asphalt concrete pavement:                                                                 32.808m2

- Culvert:                                                                                               21pieces/382md

- Rubble stone for making revetment, reinforced concrete                       7pieces/628md

- Safety traffic system (iron sheet)                                                         2.160md

3. Total value:              21.794.908.939 vndong

(In word: Twenty one billion, seven hundred and ninety two million, nine hundred and eight thousand, nine hundred and thirty nine vndong)

4. Construction time:

- Commencement:                                                                                             9/2000

- Complete :                                                                                                      6/2004