1. Scope of work:
- New construction
2. Main work:
- Cutting soil foundation class 3: 2541,5m3
- Auger-cast 193,92m
- Level soil class II: 1590m3
.
3. Contract value: 5.808.294.000 vndong
(In word: five billion, eight hundred and eight million, two hundred and ninety four thousand vietnam dong only)
4. Construction time
- Commencement 2012
- Complete 2012