Package No. 21- Bridge across river and pedestrian bridge across platform  
Back Print Yahoo

1. Scope of work:

                        - New construction                    

2. Main work:

                        - Cutting soil foundation class 3:                                     2541,5m3

- Auger-cast                                                           193,92m

- Level soil class II:                                 1590m3

.                                              

3. Contract value:                     5.808.294.000 vndong

(In word: five billion, eight hundred and eight million, two hundred and ninety four thousand vietnam dong only)

4. Construction time

- Commencement                      2012

- Complete                                2012