1. Scope of work:
- Construction new track bed and superstructure of railway connecting track operation, track gauge 1000mm
2. Main work:
- Quantity of excavating soil: 8.245m3
- Quantity of filling soil: 12.331m3
- Build drainage system for track and goods yard
- Superstructure:
+ Install new track: 663.09m
+ Install new main track: 19.21m
+ Install new turnout: 03 sets
+ Supplement rails 57 bars
+ Supplement concrete sleepers: 966 bars
+ Supplement ballast: 1.024,3m3
- Architecture, electric, water:
+ New house: 122,1m2
+ Brick fencing wall: 219m
- Telecommunication and signalling: install 03 sets rotating turnout
- Foundation of goods yard, road way 5570m3
- Construct new level crossing Km148+017 with telecommunication and signalling system
- Electric system inside station and goods yard
3. Contract value: 5.296.940.000 vndong
(In word: five billion, two hundred and ninety six million, nine hundred and forty vndong only)
4. Construction time:
- Commencement: 2/2004
- Complete: 11/2004