1. Scope of work:
- Standard road class 2
- Designed velocity: Vtk > 60km/h
- Maintain safety
2. Main work:
- Expand and renew road bed
- Hot asphalt concrete pavement,
- Excavation, mining road bed
- Filling soid for road bed, macadam aggregate
- Talus slope, safety traffic system (sheeting iron)
- Permanent bridge by presstred reinforced concrete
3. Total value: 153.824.000.000 VNĐ
Amount of construction joint stock company No.6: 138.250.000.000 VNĐ
(In word: One hundred and thirty eight billion, two hundred and fifty million vndong only)
4. Construction time:
- Commencement: 2006
- Complete: 2010