Construction: Bridge and road section Km100+000-Km134+580, under project: Road of Sothern Hau River, under Can Tho city, Hau Giang, Soc Trang, Bac Lieu  
Back Print Yahoo

1. Scope of work:

                   - Standard road class 2

                   - Designed velocity:            Vtk > 60km/h

                   - Maintain safety

2. Main work:

                   - Expand and renew road bed

                    - Hot asphalt concrete pavement,

                    - Excavation, mining road bed

                    - Filling soid for road bed, macadam aggregate

                    -  Talus slope, safety traffic system (sheeting iron)

                    - Permanent bridge by presstred reinforced concrete

3. Total value:                          153.824.000.000 VNĐ

     Amount of construction joint stock company No.6: 138.250.000.000 VNĐ

(In word: One hundred and thirty eight billion, two hundred and fifty million vndong only)

4. Construction time:

- Commencement:                                                                     2006

- Complete:                                                                               2010