1. Scope of work:
- Construct new railway
- Construct new goods yards system and roadway inside goods system;
- New drainage for goods yard
- Overhaul railway inside station
- Level crossing
- Repair roadway and goods yard.
2. Main work:
- New 04 siding track with total length 1.200m
- New goods yard and roadway inside goods yard 10.430m2
- Overhaul railway inside station: 450m
- Make track crossing 02 tracks with the width of 8m
3. Total value: 9.135.727.000 vndong
(In word: nine billion, one hundred and thirty five million, seven hundred and twenty seven thousand vndong only)
4. Construction time:
- Commencement: 11/2001
- Complete: 12/2002