Construction: Expansion National highway No.1 section Km2019+000-Km2025+561.64, under project: Expansion national highway No.1, section Trung Luong- My Thuan  
Back Print Yahoo

1. Scope of work:

- Class: Class III delta

- Technical class: 80

- Expand asphalt concrete pavement

- Execute asphalt concrete pavement

- Cutting soil, geotextile fabric

- Driving pile

- Reinforced concrete drainage, pile culvert 0.8m.

2. Main work:

- Excavate soil:                                                                                                 78.945,53m3

- Filling soil:                                                                                                      29.188,67m3

- Install geotextile fabric:                                                                                                111.112,56m2

- Sand pile                                                                                                        5.376,85m

- Reinforced concrete ditch:                                                                               1.103m

- Culverts:                                                                                                         1.870m

- Sheeting pile                                                                                                   284.600,6m

- Foundation, asphalt concrete pavement:                                                          52.891,45m2

3. Contract value:                     30.260.000.000 vndong

(In word: thirty billion, two hundred and sixty million vndong only)

4. Construction time:

- Commencement:                                                                                                         5/2005

- Complete:                                                                                                                   1/2006  

Last updated: 07/10/2014