Package No.07- Railway flyover under project: Bao Ha-Kim Son- Pho Lu, Bao Yen commune, Bao Thang commune, Lao Cai province.  
Back Print Yahoo

1. Scope of work:

                        - New construction.

                        - Cross section of main girder with the shape I

2. Main work:

                        - PC abutment on auger cast pile with diameter D=1.0m. track work at approaches of bridges with width of B-=7.0, then runoff to B foundation=5m, B=3.5m. Pavement structure include: standard asphalt 3kg/m2, thickness 2.5cm. Insert buffer macadam thickness of 14cm, Standard buffer for below layer with 14cm thickness, compaction soil K95.

.                                              

3. Total value:              19.566.903.000 vndong

(ninety billion, five hundred and sixty six million, nine hundred and three thousand vndong only)

4. Construction time

- Commencement:                                 2014

- Complete                                            2015