1. Scope of work:
- Rehabilitation road bed
2. Main work
- Cutting soil class 3: 13.934,3m3
- Demolish cement concrete plan: 3.257,2m3
- Renew pavement KC 2 A: 6.956,95m2
- Sand filling K95: 6.094,05m3
- Renew cement concrete pavement: 1.744,72m2
- Repair cement concrete pavement: 3.180,83m2
- Cutting soil for ditch: 1.427,05m3
- Stone for longitudinal drainage: 4.056m2
- Steel sheeting pile : 3.250,17m
3. Total value: 19.372.524.000 vndong
(nineteen billion, three hundred and seventy two million, five hundred and twenty four thousand vndong only)
4. Construction time:
- Commencement: 2012
- Complete: 2012