1. Scope of work:

- Class: Class III, mountainous region

- Design velocity, Vtk = 60km/h

- B = 18.1m;        Bmat= 15m

- Expand and renew foundation

- Hot asphalt concrete pavement

- Replace weak soil

- Cutting soil, mining for road bed

- Reinforced concrete ditch, pile culvert, reinforced concrete box culvert

2. Main work:

- Cutting soil for road bed:                                                                     74.782m3

- Filling soil:                                                                                          105.286m3

- Replace weak soil:                                                                               14.642m3

- Macadam aggregate:                                                                           28.634m3

- Asphalt concrete pavement:                                                                 7.329m2

- Culvert:                                                                                               17pieces/394.8md

- Reinforced concrete ditch:                                                                   6.061md

- Safety traffic system (iron sheet):                                                        1.143md

- Sidewalk for pedestrian:                                                                      13.088m2

3. Total value:              38.048.584.741 vndong

( In word: Thirty eight billion, forty eight million, five hundred and eighty four thousand, seven hundred and forty one vndong)

4. Construction time:                                       

- Commencement:                                                                                             3/2001

- Complete:                                                                                                        6/2004