1. Scope of work:
- Expand and renew road bed
- Hot asphalt concrete pavement
- Excavate, replace weak soil
- Cutting soil, mining road bed
2. Main work:
- Cutting soil: 87.856m3
- Filling soil: 74.499m3
- Replace weak soil: 3.710m3
- Macadam aggregate: 390.465m3
- Asphalt concrete pavement: 32.808m2
- Culvert: 21pieces/382md
- Rubble stone for making revetment, reinforced concrete 7pieces/628md
- Safety traffic system (iron sheet) 2.160md
3. Total value: 21.794.908.939 vndong
(In word: Twenty one billion, seven hundred and ninety two million, nine hundred and eight thousand, nine hundred and thirty nine vndong)
4. Construction time:
- Commencement: 9/2000
- Complete : 6/2004